Category
Sunrise Group LS tension detector
LS series Load cell | tension detctor | tension sensor for web tension controller
LS series Load cell tension detector
Sunrise LS series Load cell | tension detctor | tension sensors are matching with the LTC-858A automatic web tension controller. This LS series Load cell | tension detctor | tension sensors use a high precision load cell which can perform high precision tension detection with excellent temperature and hysteresis characteristics.
LS series Load cell tension detector data
![]() | |||||
![]() | |||||
| Model | LS-005TD | LS-015TD | LS-030TD | LS-050TD | LS-100TD |
| Rated torque | 50N.m | 150 N.m | 300 N.m | 500 N.m | 1000 N.m |
| Working load direction | It protects iteslf with an overload cutoff in both pusing and pulling directions | ||||
| Working condition | Working temperature: 0~40°C Vibration: under 2m/s² | ||||
| Installation | Ground installation, hang up installation, Wall mounting installation | ||||
| Weight | Approx. 1.8kg | ||||
| Shaft apply for | 204# | ||||
LS series Load cell tension detector installation | |||||
LS series Load cell tension detector application

LS series Load cell tension detector FAQ
1. When can I get the quotation?
We usually quoted within 24 hours after receiving your inquiry. If you are very urgent to get the price, please call us or tell us in your email, so that we can regard your inquiry priority.
2. How should I place the order?
Please let us know the model number based on our specs for powder clutch, powder brake, air clutch, air brake, electromagnetic clutch, electromagnetic brake and safety chucks. For air shaft and roller, please show us your drawing, or let us know your request, and then we will provide you drawing for confirmation.
3. What’s your MOQ basis?
Normally, we don’t have MOQ request, except the rollers.
4. What about the lead time for production?
Honestly, it depends on the order quantity and the type of our products. For powder clutch, powder brake, tension controller, load cell and edge position controller which is about 3-5 days. For safety chucks, air shaft and roller which need about 15-30days.
5. What is the term of delivery?
We can arrange with EXW, FOB, CIF…etc. You can choose the most convenient one or cost-effective way.
Send Message


