air shaft,electromagnetic clutch brake,Air disc brake
air shaft,electromagnetic clutch brake,Air disc brake
air shaft,electromagnetic clutch brake,Air disc brake

Taper Web Tension Controller STC-812

STC-812 Power AC165~264V, 50/60Hz, output DC 0~24V/4A
Delivery:
EXW, FOB, DAP...
minimum order:
1 piece
Country of Origin:
China
Stock Time:
1-2Day
Sunrise Taper web tension controller is with Manual and auto mode, conncet with encoder or proximity switch to use.
Quantity:
Contact Now
add to cart

Taper Web Tension Controller

Taper Tension Controller features

1. Manual | Auto mode
2. Conncet with encoder or proximity switch 
3. Calculation roll radius automatically
4. Store parameters up to 9 different materials
5. Constant tension/taper tension control
6. Output 0~24V/4A, overcurrent protection
7. Memorizes all parameters and status of the system automatically
8. Adjustable magnetic powder brake/clutch torque compensation

Taper Tension Controller Environment Spec

Working conditionAmbient temperature: 0~40 °C
Environment humidity: 35~85% RH (no frost)
Non-corrosiveness, no flammabel gas, no conductive dust, dust free
Vibration10~50Hz 0.55mm (Max 4.9m/s2)
GroundingD type grounding (Fordid to connect with strong electic wires together
WeightApprox 3.5kg

Taper Tension Controller Installation

Taper web tension controller

 

Taper Tension Controller Application

Taper tension controller

Taper Tension Controller FAQ

1.    When can I get the quotation?

We usually quoted within 24 hours after receiving your inquiry. If you are very urgent to get the price, please call us or tell us in your email, so that we can regard your inquiry priority. 

2.    How should I place the order?

Please let us know the model number based on our specs for powder clutch, powder brake, air clutch, air brake, electromagnetic clutch, electromagnetic brake and safety chucks. For air shaft and roller, please show us your drawing, or let us know your request, and then we will provide you drawing for confirmation.

3.    What’s your MOQ basis?

Normally, we don’t have MOQ request, except the rollers.

4.    What about the lead time for production?

Honestly, it depends on the order quantity and the type of our products. For powder clutch, powder brake, tension controller, load cell and edge position controller which is about 3-5 days. For safety chucks, air shaft and roller which need about 15-30days.

5.    What is the term of delivery?

We can arrange with EXW, FOB, CIF…etc. You can choose the most convenient one or cost-effective way.

 
Recommend Products

Send Message