air shaft,electromagnetic clutch brake,Air disc brake
air shaft,electromagnetic clutch brake,Air disc brake
air shaft,electromagnetic clutch brake,Air disc brake
air shaft,electromagnetic clutch brake,Air disc brake
air shaft,electromagnetic clutch brake,Air disc brake

Stable Slip Torque Powder Clutch PC Series

PC Series Rated Torque 3Nm~40Nm, Voltage DC24V
Delivery:
EXW, FOB, CIF...
minimum order:
1 piece
Country of Origin:
China
Stock Time:
1-5 daysDay
Sunrise Stable Slip Torque Powder Clutch PC Series with presiion quality, your trusted partner-Sunrise Group
Quantity:
Contact Now
add to cart

Stable Slip Torque  Magnetic powder clutch PC series

Magnetic powder clutch work principle

Magnetic powder clutch is composed of active rotor (input shaft), driven rotor (output shaft) and Yoke with excitation coil. These three parts are resembled against the concentric part and form a system which can rotate relatively. The annular gap between active rotor and driven rotor is full of alloy powder which has high permeability which is a type of auto-control component with high-performance which uses driving and driven units as main body, powder (magnetic powder) with high magnetic conductivity as working medium and exciting current as control means so as to achieve control transfer/braking torque and to keep the linear relationship between input current and output torque. With the development of the modern industry, it plays an increasingly important role in all industrial fields and demonstrates great advantages over other components.

PC magnetic powder clutch data

Magnetic particle clutch
ModelPC-003PC-006PC-015PC-025PC-050PC-100PC-200PC-400
Rated torque[kgf-m] (N-m)0.3(300.6(6)1.2(12)2.5(25)5(50)10(100)20(200)40(400)

Capacity

DC24V

75°C

 Current(A) 0.530.81 0.941.242.152.4 2.73.5 
 Power(W) 12.719.422.53051.5 57.6 64.8 84 
 No. of hours set (S) 0.080.08 0.1 0.12 0.13 0.25 0.37 0.4 
Weight(kg) 2.52.75.2914.53753 100 
Maximum speed (r/min)  1800        
  Weight of powder (g)  7.510 20 33 60 140 225 370 

Exterior

Dimension

D1120134152182225290327395
D275116126160198256295365
D3(g7)4242425574100110130
D464646478100140150200
L154164192232294360408500
L12226294355656992
L298100124136172216250291
L31114151730283035
L413.51825.5262845.55566.5
d(h7)1012152025303545
T11.513.51722283338.548.5
W(p7)4455771012
VM3*0.6P*6LM4*0.7P*8LM5*0.8P*10LM6*1P*12LM10*1.5P*20L
R6-M5*0.8P*10L6-M6*1P*10L6-M10*1.5P*20L   8-M10*1.5P*15L
S --1/8    1/4 3/8

 PC magnetic powder clutch installationMagnetic particle clutch

PC magnetic powder clutch application

magnetic particle clutch

* Printing systems: conveyors and in-feeders
*Wood-working systems: saws, wood-working machine, laminators
* Office equipment: electronic copy machines, calculators, fax machines, coin counters, printers
* Testing systems: lab machines, durability testers, measuring systems
* Food processing systems: meat cutting machines, cookie making machines, canning machines, noodle making machines
* Others: speed reducers, electroplating machinery, physics and chemistry machines, paper-making machines, pulp processing machines.

PC magnetic powder clutch FAQ

1.    When can I get the quotation?

We usually quoted within 24 hours after receiving your inquiry. If you are very urgent to get the price, please call us or tell us in your email, so that we can regard your inquiry priority.

2.    How should I place the order?

Please let us know the model number based on our specs for powder clutch, powder brake, air clutch, air brake, electromagnetic clutch, electromagnetic brake and safety chucks. For air shaft and roller, please show us your drawing, or let us know your request, and then we will provide you drawing for confirmation.

3.    What’s your MOQ basis?

Normally, we don’t have MOQ request, except the rollers.

4.    What about the lead time for production?

Honestly, it depends on the order quantity and the type of our products. For powder clutch, powder brake, tension controller, load cell and edge position controller which is about 3-5 days. For safety chucks, air shaft and roller which need about 15-30days.

5.    What is the term of delivery?

We can arrange with EXW, FOB, CIF…etc. You can choose the most convenient one or cost-effective way.

Send Message